What is the short answer?

Choose the partner that can show how it will define your problem, prepare your data, govern the risk and hand the work over. Model skill is necessary but is rarely where projects fail. The condition is that your organisation names an internal owner who stays accountable after launch.

A partner is chosen for what happens after go-live, not for the demonstration before it.

Why does partner selection matter?

RAND Corporation (2024) interviewed 65 experienced data scientists and engineers about why AI projects fail. It identified five root causes: misunderstanding the problem, insufficient data, chasing the latest technology over real problems, inadequate infrastructure, and applying AI to problems that are too hard for it.

None of these is only a model issue. A partner that sells model skill alone leaves four of the five unaddressed.

RAND also reports that 84% of interviewees cited one or more leadership-driven failures as the primary reason a project failed. Treat that figure with care. RAND states that most interviewees were non-managerial engineers, so the results may skew towards identifying leadership failures. The study is exploratory, not a survey.

Which failure figures can a buyer trust?

Failure statistics conflict. RAND says that by some estimates more than 80 percent of AI projects fail, and presents this as a secondary estimate, not its own measurement. Other widely shared figures trace back to weak sources. A buyer should not rely on any single percentage in a sales deck. Ask the partner which source it uses and read that source.

What are the options?

A buyer has three categories of route. Each suits different conditions.

  • Build in-house. Your own team designs, builds and runs the system. It gives full control and needs scarce skills and infrastructure.
  • Buy a product. You license software that includes the capability. It is fast to start and limited by what the product does.
  • Engage an implementation partner. An external team designs, integrates and often operates the system. It adds capacity and experience, and it adds a dependency.

The build and buy trade-offs are covered in build vs buy AI agents and AI consultancy vs in-house. This article assumes you have decided a partner is part of the answer.

How should partners be compared?

Compare partners on the same criteria, in the same order, using evidence you can check. The table below ties each criterion to the failure cause it addresses.

CriterionWhat to look forFailure cause it addresses
Problem scopingA written problem statement, success measures and a baseline before designMisunderstanding the problem
Data readinessAn assessment of data quality, access and gaps before any buildInsufficient data
Technology fitA reason for each technical choice tied to your problemChasing the latest technology
InfrastructureA plan for data governance and model deploymentInadequate infrastructure
FeasibilityTechnical experts who say what AI cannot yet doProblems too hard for AI
GovernanceA named risk framework and an audit trailUnmanaged risk after launch
HandoverDocumentation, training and a named owner on your sideWork that does not survive launch

RAND's recommendations point the same way. Technical staff should understand the project purpose and domain context. Each product team should commit to a specific problem for at least a year. Organisations should invest in infrastructure for data governance and model deployment.

How do you test a partner's governance?

Ask the partner to name the risk framework its work is designed around, then ask to see how it applies. The National Institute of Standards and Technology (NIST) AI Risk Management Framework (AI RMF) 1.0 was released on 26 January 2023 and is intended for voluntary use. NIST states that it is being revised as part of the White House AI Action Plan, so check the current version on the NIST page before relying on any detail. A plain explanation is in NIST AI RMF in plain English.

ISO/IEC 42001 is a separate standard for AI management systems. Confirm its status and scope on the ISO website before using it as a criterion.

Be precise with wording. A partner can say its work is designed around a framework. Be cautious of a partner that says a framework certifies its work, and ask for the evidence behind any certification claim.

What should be in the contract?

The contract should settle the questions that cause disputes after launch. Agree these before work starts.

TopicWhat the contract should state
Data ownershipYour data, and anything derived from it, stays yours. Reuse by the partner needs your written approval.
Model monitoringWho monitors performance and drift, how often, and what triggers action
UnderperformanceThe remedy if the system falls below agreed measures, including rollback
HandoverDocumentation, training, access and a transition period
ExitHow your data and configuration are returned if the engagement ends
Approval pointsWhich actions need human approval and who gives it

Cost drivers also belong in this discussion. See AI project cost: how pricing works for what moves the figure.

Should you start with a pilot or production scope?

Start with a scoped diagnostic or pilot, then gate production on agreed measures. A pilot proves the problem is real and the data is usable. A gate stops a weak pilot from becoming a large commitment.

RAND found that 14 of 50 industry interviewees said senior leaders underestimated the time needed to train an effective model. Plan for that. Agree the gate in writing: the measures, the baseline, the owner and the date. Why AI pilots stall before production explains what usually goes wrong at this step.

What should a buyer ask?

Put these questions to every partner and compare the written answers.

  1. How will you define the problem, and what measures will you agree before design starts?
  2. What do you need from the organisation's data, and how will you assess its quality?
  3. Which risk framework is your governance designed around, and how does it apply to the system?
  4. Which actions will the system take, and where does a person approve?
  5. Who monitors the system after launch, and what happens if it drifts or underperforms?
  6. Who owns the data, the prompts, the configuration and the outputs?
  7. What will the internal team receive at handover, and when?
  8. Can the buyer's team speak with a reference whose engagement resembles this one, and see the evidence for its results?

A partner that answers question 8 with named references should be asked for the evidence behind the claim. A partner that cannot show evidence should say so plainly.

Who on your side must own the project?

One named leader in the business function must own the outcome, not only the technology team. That person agrees the measures, approves the gate, and takes over operation at handover. Without an owner, the partner's work has nowhere to land.

RAND's finding that leaders underestimated time and misdirected effort supports this. The owner keeps the problem, the data and the schedule in view.

How Skelna approaches it

Skelna leads every engagement and answers for the work. It begins with an operations diagnostic that defines the problem, sets a baseline and tests data readiness. Skelna then designs, integrates and runs the system inside the platforms that hold the work, with approval points, an audit trail and monitoring after go-live. Delivery partners add capacity under Skelna's direction. Skelna's method is described on the page on how Skelna works.